EPEVER | 40A MPPT Solar Charge Controller 12V 24V Battery Voltage Max Solar Panel 100V EPEVER Regulator With MT52 Data Monitor

EPEVER MPPT Solar Charge Controller 40A 12V/24V Auto Work With MT52 Remote Meter OptionalTracer4210AN G3 2024 NEW GenerationOverview:Tracer-AN G3(10A-40A) series charge controller adopts MPPT (Maximum Power Point Tracking) technology. In any situation, it can track the maximum power point (MPP) of the solar array and obtain the maximum solar energy rapidly and accurately. It can generate up to 30% more power compared with the PWM charge controller. This series can accept max.100V Voc and work with the solar panels which are designed for on-grid applications. The multifunction LCD display the system status vivdly.MPPT tracking efficiency above 99.5%Maximum charge conversion efficiency as high as 98%Support lead-acid and lithium-ion batteriesMultiple load work modesCharging power and current limitation functionHigh-temperature charging power derating functionStandard Modbus communication protocol with RS485 interfaceReal-time energy statistics functionModelTracer4210AN G3Nominal system voltage12/24VDC/AutoController Work Voltage Range8~31VRated charge current40ARated discharge current40ARated charge power520W/12V1040W/24VMPP voltage range(Battery Voltage+2V)~72VMax. PV open circuit voltage100V(At minimum operating enviornment temperature)92V(At 25℃ environment temperature)Temperature compensation-3mV/℃/2V(Default)Relative humidity≤95%,N.C.EnclosureIP30Communication interfaceRS485(RJ45)GroundingCommon NegativeWorking temperature range-25℃~+45℃(100% loads working)Dimensions(LxWxH)(mm)252 x 180 x 63Net weight1.65kgSteps: Connect solar system in this order: 1.battery--> 2. load--> 3.PV array, and disconnect solar system in the reverse order >3. >2. >1.Battery must be connected first! Never connect soalr panel array to controller Without/Before connect battery.DO NOTconnect any inverter/wind/Alternator or Charger into the charge controller directly ! Youshouldconnect with battery and add fuse.If there is a long distance between the PV array and controller or between the controller and battery, larger size wires should be used to reduce the voltage drop and improve performance. (Recommended wire size is only for reference.)How to program for Lithium Battery?Via Remote Meter (Accessories needed: MT52)Via PC Software (Accessories needed RS485 cable :CC-USB-RS485-150U )Via Phone APP (Android or IOS), (Accessories needed:WIFI or BLE)Package List (MT52,WIFI and BLE are optional)ACCESSORIES ARE OPTIONAL!

Prime Supply_Play Life

Prime Supply_Play Life

Seller ratings 94%